New Homes · Additions · Ground-Up Construction

Build your residential project from the ground up.

Plan-based new construction coordinated from site preparation and foundation through structure, building systems, inspections, finishes and closeout.

A complete construction scope

One construction plan. Every phase working toward the same result.

New residential construction connects site conditions, approved plans, structural requirements, utilities, energy standards, specialty trades and finish selections. Each phase must be ready before the next inspection and installation begins.

Matamoros Construction Inc. organizes the work into a documented scope and practical sequence, coordinating labor, materials, qualified specialty trades and inspection milestones for the contracted project.

Every proposal identifies project-specific inclusions, exclusions, allowances and permit responsibilities.

Typical project scope

Coordinated from site preparation through completion.

Final work is based on existing conditions, approved plans when applicable, and your written construction agreement.

01

Plans & Preconstruction

Review approved documents, scope boundaries, selections, site access, utility requirements and project schedule.

02

Site & Foundation

Coordinate layout, excavation, underground work, reinforcement, forms, concrete and applicable inspections.

03

Structure & Dry-In

Framing, shear, roof assemblies, windows, exterior doors and weather protection based on approved plans.

04

Building Systems

Coordinate plumbing, electrical, HVAC, fire and energy requirements with qualified specialty trades when required.

05

Interior & Exterior Finishes

Insulation, drywall, stucco or siding, cabinets, tile, flooring, paint, fixtures, doors and trim.

06

Inspections & Closeout

Coordinate contracted corrections, final details, system startup, cleanup, walkthrough and project closeout.

Plan-based coordination

A reliable build starts before materials reach the site.

Selections, long-lead items, permit responsibilities, owner-provided materials and utility requirements should be identified early so the field team can work from a realistic sequence.

  • Detailed written scope and project assumptions
  • Material, trade and inspection scheduling
  • Documented allowances and owner selections
  • Written changes before additional work proceeds

Common questions

What homeowners ask before starting.

Do I need approved plans before construction begins?

Ground-up residential construction generally requires approved plans and permits before field work begins. The exact requirements depend on the property, jurisdiction and project type.

Can you coordinate plumbing, electrical and HVAC?

Yes. These systems are coordinated as part of the overall construction scope, using appropriately licensed specialty contractors when required.

How is the construction schedule established?

The schedule is based on plan readiness, site conditions, utility work, inspection availability, material lead times, selections and the contracted scope.

Are design, engineering and permit fees included?

Only when specifically listed in the written proposal. Design, engineering, utility and permit costs are identified separately so responsibilities remain clear.

Ready to discuss the work?

Bring us your idea, photos or approved plans.

We will review the project information and determine the right next step for an accurate proposal.